Vlaeynatie Office, Terneuzen, Netherlands

  • Tipologia costruzione:
  • Edifici per uffici
Schermo intero Chiudi

Peikko Benelux has delivered DELTABEAM® Composite Beams , HPKM® Column Shoes, Anchor Bolts and the hidden corbel solution for the new office of ‘Vlaeynatie’ in Terneuzen. The contractor was very satisfied with the fast and easy construction method of the precast frame with the Peikko solutions. Long span guaranteed by DELTABEAM® generates flexible open spaces in the office.

Informazioni sul progetto

Strutturista:
Econstruct
Anno della fornitura:
2015
Fine lavori:
2016

Contattaci