Main Hospital, Charleroi, Belgium

  • Tipologia costruzione:
  • Assistenza sanitaria
Schermo intero Chiudi

For this project Peikko Benelux delivered DELTABEAM® composite beam for the Belgium contractor Jan de Nul. 

The integrated DELTABEAM® makes slim floor designs possible. In this project this was very important because of the many HVAC piping to be connected directly under the floor slab in combination whit the limited floor height.

The project consists of three different buildings (Motel, Hotel and Poly Clinique). We have evaluated with Jan De Nul and they are very pleased with our service and the features of  DELTABEAM® composite beam they can benefit in this project.

Informazioni sul progetto

Investitore:
Grand Hopital de Charleroi
Impresa di costruzioni:
Jan de Nul NV
Strutturista:
VK Engineering
Architetto:
VKStudio Architects
Anno della fornitura:
2020/2021
Fine lavori:
2023

Contattaci