Four Seasons Staff Housing, Dubai, UAE

  • Tipologia costruzione:
  • Edifici residenziali
Schermo intero Chiudi Street View

Built in the heart of an active industrial area of Dubai, the Four Seasons Staff Housing project is a distinguishable building among the surrounding environment. The design’s original time and cost estimates were met by using Peikko's DELTABEAM® solution. 

 Consisting of two parallel buildings with a central connection, the H-shaped structure stands out with floor-to-floor windows built within concrete blocks. The original design featured cast-in-place concrete columns and cast-in-place post-tensioned slabs with external concrete block walls.

The design consists of precast insulated cladding panels, internal precast frames and walls, and Hollow Core Slabs with the following key features:
• Continuous insulation with no thermal breaks
• Flat slabs at cantilevers and corridors
• Fast construction
• Reduced internal finishes

In 2014, the project received Honorable Mention under the Multifamily Housing category at the prestigious PCI Awards. 

www.econstruct.ae

Leggi tutto down-arrow.png

Informazioni sul progetto

Dimensioni del progetto:
21000 m2
Pavimenti:
5
Investitore:
Bright Start LLC
Impresa di costruzioni:
Dubai Contracting Company
Prefabbricatore:
e.construct
Anno della fornitura:
2014
Fine lavori:
2014