For the new CEF Date, IT and Marketing Centre the architects Faulkner Brown wanted a “technologically cutting-edge building”

A kit of parts approach was taken and 90nr DELTABEAM®s were incorporated into the design along with Peikko Column Shoes & Anchor bolts. DELTABEAM® Composite Beams providing a slim floor and flat soffit also interfaced with precast floor units which incorporated combined heating & cooling system, creating a Thermally Active Building System (TABS). The frame was delivered the 11-week contractual period.

The new CEF headquarters also secured the 2019 RIBA Northeast Building of the Year Award.

Leggi tutto down-arrow.png

Informazioni sul progetto

Dimensioni del progetto:
2100 m2
Pavimenti:
2
Investitore:
CEF Ltd
Impresa di costruzioni:
PCE Ltd
Strutturista:
Curtins
Architetto:
FaulknerBrowns
Anno della fornitura:
2016
Fine lavori:
2017