The 120 bed hospital is intended for patients with chronic conditions requiring extended supportive clinical care and who are currently accommodated in highly acute intervention hospitals.
"The architectural design of the new hospital required a slim-floor structure, which was smoothly solved by using our DELTABEAM®. The use of DELTABEAM® and our concrete connections enabling a fast frame erection made it possible to maintain the very tight schedule of this project", states Radovan Endel, General Manager of Al Rashed Peikko LLC.
“Despite having a limited timeline in comparison to the size of the project, the speed of execution has not been hindered. On the contrary, construction progress is continuing to gain momentum without any compromise on quality,” concludes Tarek Al-Ajlani, co-founder at C&P.